Drilling cycle (G81, W5DDrill(481))


Drilling cycle drills holes with rapid approach to the safe level and rapid retract the safe plane level.

 

G81

 

Drilling cycle <G81> consist of the following steps:

  • Rapid tool motion to the hole center at the <Z return> level.
  • Rapid descend to the <Z safe> level.
  • Work feedrate motion to the <Z min> level.
  • Rapid tool return to the <Z return> level.

 

 

 

See also:

Hole machining operation

The ways of the holes machining